Bicycle

San Francisco San Mateo Partial Loop

http://chocolatebergamo.it/?pricher=incontri-a-rieti&e3e=fd Today, Lynn and I expanded on our South Bay ride, Sawyer Camp Trail to Woodside followed the SFtoG Bayway route backwards.  This time, we went a few miles further to the Milbrae BART station to complete a 60 mile ride.

http://zikologistes.com/?makakafrancyzka=irc-hispano-alicante&aea=2a It was much like before but took less time. We knew where to go and didn’t need to stop and look at the map.  (Thank goodness, since I forgot it at home!)

Villa del Prado 2da Sección This time, I got some pictures of the cats by the San Mateo Bridge and more info about them from a sign on the trail.  Apparently, an organization exists, The Homeless Cat Network, to care for and control the population of these cats.

We also passed by a few golfing facilities including Mariner’s Point Driving Range.

Since we beat the sunset this time, we got to check out more amazing landscapes.  I really want to go back with more time and a better camera.  (Also, check out how neat this area is from a satellite view.)

On this ride, I became inspired to step up my training for the AIDS/Lifecycle.  I think this means two longish rides on the weekend and some shorter rides during the week.  I never made it to the spinning class.  6:30am is a little early for me to do anything.  I did however make it up to Twin Peaks before work one day this week. We’ll see!